spacer (1K) spacer (1K) Diment Construction & Engineering Company, Inc. spacer (1K)
spacer (1K) spacer (1K) spacer (1K) spacer (1K)
spacer (1K) spacer (1K)

(Partial Listing)

 

Midtown Parking Garage - City of Oswego, Oswego, NY $1,000,000.00.  Total 43,600 sq. ft. deck replacement.  The deck employed a state of the art concrete design mix.  The garage was given back to the City for parking in 55 days.

 

Material Recovery Facility - County of Oswego, Oswego, NY - $5,200,000.00.  Facility with production and office buildings to provide material separation and recycling operations.

 

Transit Shed Renovation - Port of Oswego Authority, Oswego, NY - $1,200,000.00.  Renovation of a 100,000 sq. ft. warehouse.

 

120" Mill Coolant Upgrade - Alcan Rolled Products Company, Oswego, NY - $1,500,000.00.  Managed and performed upgrade to existing coolant system.  Work included installation of equipment and construction of a new building.

 

Truck Dock Doors Installation -Miller Brewing Company, Fulton, NY - $50,000.00.  Cut out and installation of overhead doors in existing concrete wall, including installation of dock leveling equipment.

 

Remediation to a Large Industrial Plant - Secrecy Agreement does not allow disclosure of this client.  $6,000,000.00.  Management and implementation of hazardous cleanup during scheduled shutdowns.  Work included coordination with environmental engineers using high pressure cleaning and encapsulation of production areas with approximately 200 men schooled in 40 hour haz-com course.  Diment performed all removal and reinstallation of machinery and disposal of waste.  All work was completed in 37 days.

 

Physical Education Addition - Oswego High School, Oswego, NY - $1,300,000.00.  Construction of a gymnasium and auditorium addition to existing school.

 

Rock Bolt Installation - Niagara Mohawk Hydro-Dam, Trenton Fall, NY - $40,000.00.  Installation of 40' - 0" Lg. rock bolts.

 

Slitter Line Installation - Alcan Aluminum, Oswego, NY - $290,000.00.  Installation of new can body stock slitter line equipment.

 

Remelt Six Excavation - Alcan Aluminum, Oswego, NY - $600,000.00.  Excavation of rock via blasting to a depth of sixty feet within an existing facility.

 

Bulk Storage Facility - Port of Oswego Authority, Oswego, NY - $2,100,000.00.  Engineering, design and construction of laminated arch dome 32,000 ton capacity building including the installation of 600 linear feet of ship unloading conveying system.

 

72" and 88" AGC System Upgrade - Alcan Aluminum, Oswego, NY - $9,500,000.00. Construction and management, engineering and installation of an automatic gauge control system and related construction.

 

In Plant Tank Soils Remediation and Tank Closures - Miller Brewing Company, Fulton, NY - $300,000.00.  Shipping docks, tractor-trailer landing pads.  Sulfuric acid tank, new concrete dyke and fiberglass mat system. Can plant new structural steel mezzanine with stairs, catwalks and grated decking.

 

Christmas Shutdown - Traffic Aisles, Remove Wood Floors, Install Structural Beams, Decking and Concrete - Sealright Packaging Company - Fulton, NY - $200,000.00.  Beams, decking and concrete.  Foundations and equipment for new finishing line.  Install foundations and enclosure for new nitrogen storage facility.  Repairs and coatings of 10,000 gallon clay tile tank.

 

New Virgin Material Storage Addition at Container Plant - Miller Brewing Company, Fulton, NY - $480,000.00.

 

New Fire/Water Pump House Building - Reynolds Can Plant, Fulton, NY - $225,000.00. 

 

Complete Removal & Rebuild of Wagner-Dortmund Ring Rolling Mill, In Plant - Ovako-Ajax, Wayne, MI - $280,000.00.  On Site including civil structural repairs, hi-pressure hydraulic metric piping (6000 P.S.I.) pumps, power track and pressure regulators.  Rebuild all cylinders.  This was a time if of the essence project.  Work proceeded with two twelve-hour shifts, six days a week.  Completion was ahead of schedule under a quoted hard money bid with a split savings percentage with owner.

 

All Saints Mausoleum - St. Peter's Cemetery, Oswego, NY - G.C.  $700,000.00.

 

Interior Renovations - St. John's Church, Oswego, NY - $350,000.00.

 

Clerk of Works Church Renovations - St. Mary's Church, Oswego, NY.

 

Lake Water Recirculated Cooling Water System - Alcan Aluminum Company, Oswego, NY - $7,500,000.00.  All site work, form and pour concrete structure, mechanical piping, three 48" dia. x 50' screw pumps, 4000' of 36" dia. discharge pipes to lake pump house.  Divert 10,000,000 G.P.D. flow from plants 5' dia. concrete pipe line to new diversion structures and to new oil water separator.

 

New Copper Furnace Installation Project - Revere Copper Products, Rome, NY - $185,000.00.

 

Sithe Independence Water Transmission Main - City of Oswego, Oswego, NY - $773,000.00.  Complete retrofit of a 950' bridge over the Oswego River.  Jacked up and shored 11' deep grinders for the 950' length to rebuild support piers.  Rebuild 8 support piers, installed new concrete deck and installed and insulated 30" of concrete lined steel water line.

 

New Transfer Conveyor Building - Owens Brockway Bottling Plant, Auburn, NY - $25,000.00.

 

Exterior Cullet Bay Receiving and Storage Area - Owens Illinois Bottling Plant, Fulton, NY - $289,000.00.

 

Complete Installation of New Refiner (Civil and Mechanical) - Felix Schoeller Technical Paper, Pulaski, NY - $120,000.00.  Repairs to shaker foundation during Christmas shutdown.  Repairs and coatings of 10,000 gallon clay tile water tank. Cleaning and inspection with evaluation and cost analysis of best methods and products to repair and coat 300,000 gallon clay tile tank.

 

Design Build New Boiler and Equipment Building - Sprague Energy, Oswego, NY - $225,000.00.  Design build foundations for 1,000,000 gallon asphalt tank.

 

Design Build Salt/Sand Storage Facility - Alcan Rolled Products Company, Oswego, NY - $300,000.00.  New facility includes new truck and equipment shop.

 

Installation of New Automated Sheeter and Packaging Line - Felix Schoeller Technical Papers, Pulaski, NY - $4,000,000.00.  New 40,000 sq. ft. room, all civil, mechanical and installation of Korbell Paper Link Sheeter.

 

NOTE:  Because of secrecy agreements with many of our clients, some major projects cannot be listed.  However, upon client approval, we can arrange a possible meeting for discussion.

 

 

 

spacer (1K)
spacer (1K)
spacer (1K)
photo2 (26K)
spacer (1K)
spacer (1K)
spacer (1K) spacer (1K) spacer (1K) spacer (1K) spacer (1K)
Home Page | About Us | Company Philosophy | References | Job Photos | Contact Us | Recognitions
Copyright © 2003 Diment Construction Company, Inc. All Rights Reserved.